Project Details

Project Overview

Project Area Map

LACMTA proposes to construct the East San Fernando Valley Transit Corridor Phase 1 Project, a 6.7-mile at-grade light rail transit (LRT) system with 11 stations, nine traction power substations, overhead contact system, and a maintenance and storage facility.

The Project would improve mobility in the area by:

  • introducing an improved north-south transit connection between key transit hubs/routes;

  • enhancing transit accessibility/connectivity for residents to local and regional destinations and activity centers;

  • increasing transit service efficiency; and

  • encouraging a modal shift from driving to achieve reductions in greenhouse gas emissions. 

This transit project - forecasted to open in 2028 - will use the same rail technology as Metro’s A, C, E and L Lines adding 14 new stations between the G Line (Orange) Van Nuys Station and the Sylmar/San Fernando Metrolink Station. This system for the Valley means better transit with improved quality and service.

LACTMA Project Homepage:
https://www.metro.net/projects/east-sfv/

Phased Approach

Phase 1: Preconstruction Services
Phase 1 Work consists of preconstruction services during which the Contractor shall work collaboratively with LACTMA to:

TASK 1 - Project Administration
TASK 2 - Validation of Base Design
TASK 3 - Iterative Value Engineering
TASK 4 - Update Base Design Opinion of Probable Cost
TASK 5 - Develop Design Management Plan
TASK 6 - Permits, License, and Agreements Management
TASK 7 - Cost Estimates and Phase 2 Proposal

Start: Late 2022
DBE Goal: 19.33%
Estimated Phase 1 Cost: $30 mill. to $50 mill.

Potential scopes

Phase 2: Design and Construction
The Phase 2 Work consists of services during which the Contractor shall work collaboratively with LACTMA to:

TASK 1 - Identified Early Work Packages

  • Long Lead Item Procurement

  • Utility Adjustments

  • Design to Approved for Construction and Design Support During Construction

  • Geotechnical

  • Investigative Works

  • Hazardous Materials

  • Cable Transmission System (CTS)

  • Demolition

  • Integrated Project Management Office

Task 2 - Complete All Construction Work

December 2023 – December 2027
DBE Goal: Expected
Estimated Phase 2 Cost: TBD

Potential scopes: COMING SOON